Bring a campaign identity to display T-shirts and side-display caps. Plan the artwork, product mix and delivery schedule together, with a sample before the bulk order.
Concept visuals. Final construction is approved with your sample.
CHOOSE THE RIGHT FORMAT
A coordinated look.
A practical product plan.
Discuss a T-shirt, a cap or a coordinated set for your team, event or merchandise range. Quote the quantities for each product rather than assuming one shared minimum.
Add the campaign artwork to a side-mounted round display. The cap uses a silver aluminum-alloy surround without a towel patch or heat-transfer graphic.
Placement
Side of the cap
Construction
Silver aluminum alloy
Cap order minimum
Confirmed for your configuration in the quotation
✓Approve cap fit and side placement on a physical sample.
✓Confirm image legibility and the intended use before the event.
✓Request a separate cap quantity, price and schedule confirmation.
Make the practical details part of the brief, so your team can check the product and the imagery before it is needed.
01
Bring a consistent campaign identity
Supply your approved logo, campaign colors and original artwork. Check text size, cropping and contrast on the round screen during sampling.
02
Review the intended use
Test the proposed display content and phone compatibility with the sample. Discuss how the team will load images and handle the display; do not assume continuous all-day operation.
03
Include clear care instructions
The display is removable and cannot be washed. Keep electronics out of garment washing and follow the agreed cap care instructions.
THE PROJECT PLAN
Work back from
your event date.
The 7–15 day reference is production time after final approval. Artwork review, sampling, approval and shipping need their own place in the schedule.
01
Set the delivery target
Share the event date, the date you need stock in hand, the destination and quantities for each product.
02
Prepare and sample
Supply the campaign artwork and product brief. Reference samples are RMB 300 per piece, with a 3–5 day development target after specification approval.
03
Approve the handover details
Check the sample, image upload, content legibility, fit, size mix and care information. Confirm the order and transit plan.
04
Confirm production and shipping
Reference production is 7–15 days after final approval. Shipping time is additional; the final schedule is agreed for your order and destination.
Reference terms: RMB 300 per piece · usually 3–5 days after specification approval. Production and transit schedules are confirmed separately for the final order.
YOUR NEXT STEP
A clear brief
for a fixed date.
Tell us when the products need to arrive, then share the campaign requirements. The project is reviewed before any delivery commitment.
Start with This Brief↗Your project context is carried into the inquiry form. Add the details you have available.
01
Event and campaign
The occasion, wearer group and intended product use.
02
Product mix
T-shirt and cap quantities, T-shirt sizes and preferred colors.
03
Campaign artwork
Approved logo, color references and proposed still images or GIFs.
04
In-hand date
Event date plus the earlier date when your team needs the products.
05
Destination and handover
Country, postcode, packaging needs and the sample-review contact.
MEET GAHUMI
A closer look at your production partner.
Guangdong Gahumi Textile Co., Ltd. brings trade and manufacturing together. See the company footage, then discuss how your sample and order will be developed.
Can we use the same campaign artwork on T-shirts and caps?+
You can develop a coordinated visual direction across both products. The T-shirt has left-chest decoration and a black rubber screen surround; the cap has a side display and an aluminum-alloy surround. Approve each construction and the artwork on its own sample.
Can you guarantee delivery within 7–15 days?+
No delivery promise is made from the reference production period. The 7–15 days covers production after final approval, and excludes artwork review, sample development, approval time and shipping. Share your required in-hand date and destination for a project-specific schedule.
What quantities should I put in the brief?+
List T-shirt and cap quantities separately. The confirmed T-shirt MOQ is 100 garments total across agreed styles and colors. Cap quantities and configuration are reviewed separately in the quotation.
What should we prepare for the display images?+
Provide your own approved logo, still images or GIFs. Both confirmed modules use 240 × 240 pixel TFT screens. Use the sample to check round cropping, legibility, image upload and phone compatibility before preparing the team handover.
Will the cap display run for the whole event?+
Do not assume all-day operation. The PAI162 cap device specification lists a nominal 3 hours of always-on use; actual runtime varies with settings and content. Test your intended use with a sample and plan the event operation accordingly.
Can the products be cleaned after an event?+
Detach the electronic display before washing or cleaning. The screen itself cannot be washed. Follow the approved T-shirt care label or cap care instructions, and include this guidance in the team handover.
For Events & Merchandise
Start with the idea.
Plan for the date.
Share the product mix, campaign artwork and required arrival date. We will review the sample and production plan with you.